Coming Back to a Project
Coming Back to a Project
Section titled “Coming Back to a Project”The first hour back. Your First Product with BoB ends on a Friday with a release. This tutorial starts when you come back to the same project after a real gap: days or a week, while the loop, and maybe the farm, kept working. You will walk the same routine every time you return, in the same order, and end with one ranked choice of what to do first. Every command below comes from the Coming Back explanation, which also covers why each stop comes where it does.
What you will do
Section titled “What you will do”Before the gap, you leave work behind on purpose: two new requirements, a plan and a run that you do not watch. After the gap, you spend one hour on a fixed routine:
| Stop | Question | Time |
|---|---|---|
| 2 | Is this machine current, and what changed in BoB? | 10 min |
| 3 | What happened here, and is the project healthy? | 5 min |
| 4 | What is waiting on me? | 5 min |
| 5 | Where is the plan? | 5 min |
| 6 | What did the runs record? | 10 min |
| 7 | What did the sessions learn, and what have I never tried? | 10 min |
| 8 | What is overdue? | 3 min |
| 9 | What did the farm do? | 5 min |
| 10 | What do I do first? | 5 min |
That is under an hour. The routine is the same one /status and /what-next
implement, so you are learning to read the tools, not a separate habit.
Before you start
Section titled “Before you start”- Finish Your First Product with BoB first. This tutorial
runs on the same
hello-linksproject and assumes its two capabilities (#1Short links,#2Manage links) exist. - A real gap. Leave at least two days between Stop 1 and Stop 2. The routine only makes sense when you have genuinely forgotten the details.
- A farm is optional. Stop 9 shows what to look for if you delegate work to one. If you do not, it takes a minute and finds nothing.
Issue numbers below are examples: the plan is #12 and the todo the loop files is
#13. Your numbers will differ, because every report the loop files is an issue too.
Use the numbers your commands print.
Part 1 — Before the gap
Section titled “Part 1 — Before the gap”Stop 1. Leave work behind
Section titled “Stop 1. Leave work behind”Open Claude Code in hello-links (claude -a3) and file two requirements under
Manage links. Then, in a shell, plan them and start a run you will not watch:
/requirement Links can expire: an optional expiry date after which the short code returns 410. Part of #2./requirement Email me a weekly visit summary for every link. Part of #2. Depends on the expiry requirement.bob plan build --area manage-linksbob warp start --flightplan 12 --level 3Say yes when /requirement asks whether each requirement is approved. Use the
plan number bob plan build prints in the bob warp start line.
What you should see.
- Two new
reqissues, labelledapprovedandarea:manage-links, each ending withPart of #2. The email requirement also says what it depends on. bob plan buildprints the new plan’s number.bob warp startruns its preflight, then names the tmux session the run started in.
What just happened. The run works the plan in order while you are away. Expiry is
ordinary code, so the loop can finish it. The email needs a provider account and an
API key, which only you can supply. The loop does not guess on a decision like that.
It files a todo for you, skips the work and ends the run.
Checkpoint.
bob plan status 12lists both requirements, andtmux lsshows the run’s session. Now close the laptop and come back in a few days.
Part 2 — The first hour back
Section titled “Part 2 — The first hour back”Stop 2. Bring the machine up to date
Section titled “Stop 2. Bring the machine up to date”Do this in a plain shell, before you open Claude Code:
bob doctorbob update --dry-runbob updatebob doctorWrite down the version line from the first bob doctor before you run the update.
What you should see.
- The first
bob doctorends with a verdict, and itsversionline shows the release you left on. bob update --dry-runnames the tag it would move to, and changes nothing.bob updatefetches, fast-forwards the BoB source checkout, deploys it and runs the doctor again. If you are already on the newest release, it says so and changes nothing.- The last
bob doctorshows the newversionline.
What just happened. Every later stop runs on BoB, so BoB goes first. bob update
refuses to run while a Claude Code session is open on the machine, because redeploying
the settings would silence the hooks in that session. That is why this stop comes
before Claude. If it refuses for another reason (a dirty checkout, a failed fetch), it
names the reason and changes nothing.
To see what changed, open CHANGELOG.md in the BoB source checkout and read the
sections between your old version and your new one.
Checkpoint. The last
bob doctorreports no drift, and you can name one change from the changelog.
Stop 3. Read the catch-up
Section titled “Stop 3. Read the catch-up”Open Claude Code in hello-links (claude -a3) and run:
/statusWhat you should see. One report in two parts:
- Catch-up: recent activity (commits by type, issues closed), the status of each
capability, and one
Health:line that readson-track,at-riskoroff-track, followed by the counts it was derived from. - Next up: the ranked list of what to work on. Your todo appears in its own “Your action items” section.
What just happened. One read of the tracker and the commit history replaced
twenty minutes of scrolling. With the email requirement blocked, the health line is
probably at-risk: the rubric counts one blocked item as a risk. The rest of the
routine fills in the detail behind each line of this report.
Checkpoint. You can say, without looking again, what closed while you were away and what the health line says.
Stop 4. Clear your own queue
Section titled “Stop 4. Clear your own queue”gh issue list --label todo --state opengh issue view 13gh issue edit 13 --add-label completedThe second line opens the todo the loop filed. Read it: it says in one sentence what is
blocked and why, then lists numbered steps, then Blocked by #NN. Do the steps (for
the email requirement: create the provider account and store its API key where the todo
says). Then run the third line.
What you should see.
gh issue list --label todolists the todo the run filed, assigned to you.- After the edit,
gh issue view 13shows thecompletedlabel. The issue is still open.
What just happened. completed is the resume signal, not closing. The next loop run
reads the label, removes blocked from the issue the todo names, closes the todo with a
comment, and picks the work up. If you decide the work is no longer wanted, close the
todo without completed: the loop then treats the work as cancelled and never
resumes it.
Checkpoint. No open todo is left without either the
completedlabel or a decision to close it.
Stop 5. Find the plan
Section titled “Stop 5. Find the plan”gh issue list --label flight-plan --state openbob plan status 12What you should see. The plan you built in Stop 1, with the expiry requirement
checked and the email requirement runnable. A todo labelled completed no longer
gates anything. If you skipped Stop 4, the email requirement shows as gated, and
the status names the todo.
What just happened. The plan is the order you committed to before you left, so it
outranks anything that joined the queue since. bob plan status only reads, so run it
as often as you like.
Checkpoint. You know the plan’s number, and how many of its items are runnable.
Stop 6. Read the records
Section titled “Stop 6. Read the records”gh issue list --label session-report --state all --limit 5gh issue list --label chunk-report --state all --limit 10gh issue list --label decision --state all --limit 5gh issue list --label lesson --state all --limit 5Open the newest session report (gh issue view <number>) and read it in full.
What you should see.
- One session report for the run you started in Stop 1. It lists the requirement it finished, the one it skipped, the todo it filed and the tokens it used.
- One chunk report for each commit the run made.
- Your decision and lesson from the first week, plus any the run filed.
What just happened. Reports say what happened. Decisions and lessons say what to do
next time. BoB never puts both labels on one issue, so each list stays short enough to
read. The session report is the fastest way to confirm what /status summarised.
Checkpoint. You can name the commit that delivered expiry, from its chunk report.
Stop 7. Recall what the sessions learned
Section titled “Stop 7. Recall what the sessions learned”The first line provisions the recall skill once. The other two read the loop’s notes and tour the tools this project has never used:
bob provision add skill memory-recallnode ~/.claude/scripts/warp-drive/loop-notes.js listbob tourThen, back in Claude Code:
/memory-recall expiryWhat you should see.
bob provision add skill memory-recalladds the skill to the project’s manifest. If the project has it already, it says so.- The loop-notes line prints the quirks the loop recorded here, such as a flaky test or a command that needs a flag. It may print nothing.
bob tourprints counts of unknown, parked and in-use items, then lists each unknown item with one line on when to use it and the command to try./memory-recall expirylists the memories that match, best first, or says none match.
What just happened. The tracker holds what the team knows. Memory and loop notes
hold what the sessions learned, which never reaches an issue. Every new run starts
with the loop notes, so it is worth knowing what they say. The tour is the reverse
view: tools you have and have never used. Try one with bob tour --tried <item>, or
decide against it with bob tour --park <item>.
Checkpoint. You have read the loop notes (or confirmed there are none), and marked one tour item as tried or parked.
Stop 8. Check what is overdue
Section titled “Stop 8. Check what is overdue”bob ritual dueWhat you should see. One line per ritual (retrospective, dependency audit, vision
review and others), each graded overdue, due, upcoming or unknown. A ritual’s
last run is read from its closed ritual-run issues, and a ritual that has never run is
due. On a new project like hello-links, that is most of them. If it says the
directory is not a managed project, run bob ritual due --project hello-links.
What just happened. Rituals are the one kind of work no queue surfaces on its own:
nobody files them, they fall due. A project that sat untouched for two weeks is the one
most likely to have missed one. An unknown ritual means its run history could not be
read. It is never counted as overdue.
Checkpoint. You know whether anything is
overdue. If something is, it goes to the top of Stop 10.
Stop 9. Check what the farm did
Section titled “Stop 9. Check what the farm did”gh issue list --label flight-plan --state all --search "farm (unattended) in:title"gh pr list --state merged --limit 10bob status --scope fleet --no-liveWhat you should see.
- If the farm worked on this project: a plan titled Flight plan: farm
(unattended), with one comment per night headed
## bob tick <date>, plus merged PRs it opened and merged when CI passed. bob status --scope fleet --no-livelists each fleet machine with when its snapshot was taken, and the state of each project on it.stalemarks a machine that has not reported for more than a day.- With no farm, no farm plan and no PRs, and only your own machine in the fleet view.
What just happened. You can tell a farm run from your own by where it came from:
the farm builds its own plan, comments its digest on it, and never pushes to main
directly. It opens a PR and merges only on green CI. Your own Level 3 run merges
directly and has no PR. An empty result is an answer too: everything you read in Stop 6
came from your own runs.
Checkpoint. For every merged change since you left, you can say whether you or the farm made it.
Stop 10. Decide what to do first
Section titled “Stop 10. Decide what to do first”Before you run anything, write down your own first choice from the evidence, in this order:
- an overdue ritual from Stop 8;
- an open todo from Stop 4 you have not handled;
- the active plan’s runnable items from Stop 5;
- the rest of the approved queue: highest priority first, then work that unblocks other work, then bugs before requirements.
Then ask the tool:
/what-nextWhat you should see. The same order. Any overdue ritual is at the top, then your
action items, then one row for the plan (flight-plan #12 — 1 runnable of 2, resume with warp-drive --flightplan 12), then any loose approved work.
What just happened. /what-next ranks with the same rules you just used, so the
tool and your reasoning agree. If they do not, one of the stops has evidence you
skipped: find it before you overrule the tool.
Checkpoint. Your written choice matches the top row of
/what-next. Start it: for this tutorial, that is/warp-drive --flightplan 12, which picks up the email requirement now that its todo iscompleted.
Where you are now
Section titled “Where you are now”You came back to a project you had half forgotten. In under an hour you knew the machine was current, what happened while you were away, what was waiting on you, where the plan stood, what the runs and sessions recorded, what was overdue and what the farm did. You also made one choice, the same one the tool made. Do the same routine every time you come back, in the same order. After a few times it takes twenty minutes.
Where to go next
Section titled “Where to go next”- Coming Back to a BoB Project: why each stop comes where it does.
- Farm Tick (the night shift): what the farm runs, and how to delegate work to it.
- Rituals: every ritual, its cadence and how to hold one.
- Todo format contract: what a todo contains
and how
completedresumes work.